Our next stop on the 10-year anniversary series looking at the changes to and around Pittsburgh’s bridges is the Herron Avenue Bridge. This is another bridge that passes over the MLK Jr or East busway. Traveling down the busway toward downtown from the Baum and Centre Bridges we looked at last month, this bridge is three bridges closer to downtown. It connects the Polish Hill and Lawrenceville neighborhoods in Pittsburgh.
On the northeastern side of the bridge is the former Iron City Brewery. When I walked this bridge in 2012, there were plans in the works to redevelop this complex of 20 or so buildings. Ten years later, not much has changed on this site – other than the clearing away a large pile of dirt and debris near the loading docks (visible in the second photo pair below). According to new articles about the site published in 2019 and 2021, some exterior stabilization has occurred and there are still plans in the works to renovate the site (WPXI, CBS, City Paper, Pittsburgh Business Times).
One the other side of the bridge, a major transformation is underway changing from a warehouse with large parking lots to a dense mixed-use development. The new buildings are visible from many angles of and from the bridge (see all but the second photo pair below). Construction started last summer and the project website says that pre-leasing was to begin in spring of this year, but based on the information on the website it doesn’t look like this has begun yet. One of the amenities listed is the views, which include the views of downtown stolen from the bridge.









